RIDGID R4511 Manual do Operador Página 5

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir
  • Página
    / 9
  • Índice
  • MARCADORES
  • Avaliado. / 5. Com base em avaliações de clientes
Vista de página 4
Riving Knife Alignment
At this point of setup you will need to align or verify alignment of the RK to the blade.
Install your blade if you have removed it earlier. You will need to use a straight edge,
steel ruler, framing square or something similar. The RK needs to be completely in the
shadow of the blade. Alignment can be accomplished a few different ways. Refer to
your Operator's Manual.
The Clamp assembly
Once you have the riving knife securely installed and aligned, you can install your
throat plate. Install this according to you Operator's manual.
The three slots on the top of the two largest splitters are used with this clamp. The
three steel pins in the lower portion of the clamp slip into these slots and lock down
when the knobs of the clamp are tightened. There are also set screws in one clamp
half that serve to keep the two clamp halves parallel when tightening regardless of RK
thickness. You loosen the knobs and slide the clamp toward the rear of the saw and lift
up. Installation is the reverse. This clamp helps to prevent lifting of the material
depending on material thickness being cut.
Feeding the wrong thickness material can be dangerous. It can stop material in mid
cut. Always check or adjust the guard height for material being cut.
Vista de página 4
1 2 3 4 5 6 7 8 9

Comentários a estes Manuais

Sem comentários